Answers about timber internal doors, finishes, installation and project requirements.
The main components are the leaf, frame and architraves. Hinges, handles and locks affect the way it works. Ask which items, measurements and installation services are included in your quotation.
Record the width and height of the structural opening, wall thickness and finished floor level. Note whether an existing frame will be retained and the intended opening direction. For multi-door projects, match each measurement to a room or opening number.
Start with the room, the desired appearance and how the door will be cleaned. Compare a sample beside the flooring and wall finish under the light in that space.
Follow the care instructions for the chosen finish and use a suitable soft cloth. Avoid water collecting near the bottom edge or frame joints.
Agree a physical sample for colour, texture and sheen before production. Review the leaf, frame and architraves together, and note any openings that require different hardware or dimensions.
Ask for evidence covering the complete doorset and the proposed installation. Fire and acoustic requirements are assessed separately.
Share the door schedule, quantity, size, intended use and any performance or finish requirements.
The certification section includes the original documents and details of the issuing organisations.
Review them under the lighting and alongside the finishes that will be used in the space.
List each difference against its opening in the door schedule.
Review the as-built opening and finished floor level before production.
The leaf moves. The frame is fitted to the wall opening and supports it.
Share the project’s door schedule, room types, key specifications and delivery plan.
Confirm each performance requirement separately using evidence for the offered configuration.
Sliding options can be assessed for the intended opening and programme. The current fire-resisting options exclude sliding systems.
The team confirms the approved details, quotation scope, production and delivery plan.
Check the finish, lower edge, frame joints and moisture exposure with the technical team.
Share the project name, door code and order details for maintenance information or technical support.
